The low voltage rail powered transfer cart has the advantages of unlimited running time, simple maintenance and long service life. However, the track installation needs to be insulated, so you need to pay attention to it when using it.
1. Before use, check in detail whether the nameplate data meets the matching requirements.
2. When multi-point power supply is used and the step-down transformer must be operated in parallel, first check the polarity of the transformer outlet. The primary side of the step-down transformer should be powered by a power point. When the rail is too long and has to be powered by different power sources, the 36-side rail and the compensation line should be disconnected, and each section of power supply should be implemented.
3. The midpoints of the low-voltage coils of the transformer of the BDG transfer cart have been drawn out and overlapped with the iron clamps. Under normal circumstances, the step-down transformer should be connected to the neutral line of the workshop at the bolt with the grounding mark, and the step-up transformer should be connected to the vehicle body. In addition, other parts of the low-voltage 36 circuit (including the rail) should not be repeatedly connected to zero. When adopting a special grounding connection method, care should be taken not to form a short circuit, and if necessary, disconnect the lap contact of the low-voltage coil of the transformer.
4. The installation location of the step-down transformer should be well ventilated, away from other heat sources, and try to make the least impedance to the farthest power supply point of the rail.
5. The raising and lowering transformers should be installed on a horizontal surface, and other installation methods are not allowed.
6. The low-voltage side of the transformer has large current and low voltage. Special attention should be paid to the firmness and reliability of the terminal, anti-loose and rust-proof, and ensure that the current contact surface is large enough. A single wire cannot pass through metal sleeves and other closed metal channels that may cause eddy currents.
7. Check the insulation resistance between the transformer coil and the primary and secondary windings before putting it into operation. When it is less than one megohm, it should be dried. Insulation resistance should be measured when the shell point and the inlet and outlet connectors are disconnected.
8 After the transformer is checked and installed, test the power supply. Under no-load conditions, check that the no-load current is not too large, there is no strong iron core vibration and abnormal noise, and the iron core and conductive parts have no temperature spikes, and the technical status is considered normal. Generally, the no-load current of the step-up transformer should not exceed 20% of the rated value, and the total no-load current of the primary side of the step-down transformer should not exceed 40% of the rated value. Whether the status is normal.